Calculating Time For Certain Distance And Speed? |
Calculating Time For Certain Distance And Speed? - Excel |
|
If I have speedvalue in cell A1 let say 100 km/h and I put the distance in cell A2.
How would the formula look like in A3 to see the time it takes to drive this distance?
Example
A1 = 100 km/h
A2 = 750 meters
A3 = time to travel the distance
Similar Topics
Please help!!!
We have a client who will pay using the 1/4, 1/2/ and 3/4 of an hour increments as follows:
From the hour mark to 6 minutes = 0 time paid
Over 7 minutes to 15 minutes = 1/4 hour 15
16 minutes to 30 minutes = 1/2 hour 30
30 minutes to 45 minutes = 3/4 hour 45
46 minutes to 60 minutes = one hour.
They work on shifts and the operation is 24 hours. Each gets 30 minutes for breaks which is not paid. Pay is biweekly and overtime is anything over 40 hours. Currently, the template we are using looks like this (sorry, I could not figure out how to paste it so you can see it in Excel layout):
WEEK 1 Sunday Monday Tuesday Wednesday Thursday Friday Saturday
5/16 5/17 5/18 5/19 5/20 5/21 5/22
TIME IN ENTER TIME, INCLUDE AM OR PM
TIME OUT
TIME IN
TIME OUT
TIME IN
TIME OUT
TIME IN Total Hours First Week
TIME OUT
HOURS WORKED-OR- choose one
*HOLIDAY WORKED
PAID HOLIDAY (not worked)
*OTHER PAID HOURS
EXPLANATION OF *HOLIDAY WORKED HRS OR *OTHER
I am very new to Excel and need help creating a formula that will allow us to calculate this timesheet? I am in desperate need for help.
Thanks..
For example: Cell A1 has a time format (hh:mm) value of 04:00; which is the Start Time. I would like cell D1 to have a text format value of "04:00" (result is dependant upon what is entered in A1). I would duplicate the same formulas to reflect Stop Times in other cells.
My final result is to have another cell (F1) use the Concatenate formula to have the Start and Stop time shown in one cell as "04:00 - 12:30". The times would change based on the Time formated values entered into the Start and Stop time cells.
I have researched this in the board and found many excellent ways to do the opposite, but not convert Time format to Text format. Any assistance is greatly appreciated.
-Shane
For example, if I have a total of 53 calls and the total talk time is 4:19:05, what would the average talk per call be? I tried doing everything in seconds (this would give me a total of 15545 seconds) but the total I was getting is 4:89.
What would the formula be to get the correct average time?
Cell B5: start time: 4:15 formatted as 4:15:00 am
Cell B6: finish time: 6:15 formatted as 6:15:00 am
Cell B7: total time: 2:00 formula in cell: =TEXT(B6-B5,"h:mm")
Cell B8: total batches processed: 22 (this is entered manually)
Cell B9: batches per hour: formula in cell: =B8/TEXT(B7,"h")
as long as I have this formula in cell B9 the answer comes out correct which should be 11 per hour.
If the formula in B9 is B8/B7, the answer is 264.0, Is this because of the way excel is reading the total time or the total time is formatted as a time, not an actual number? Is this the correct way to solve the problem?
answer should be 11 per hour.
example;
8:00 to 8:07 = 8.0 hrs
8:08 to 8:23 = 8.25 hrs
8:24 to 8:38 = 8.5 hrs
8:39 to 8:53 = 8.75 hrs
8:53 to 8:59 = 9.0 hrs
I am having trouble writing an equation that would sum the clock-in and clock-out times (2 per day) and display the total time in these quarter hours and adding an additional hour if it is >= to *:53. Any help would be great.
Can you please help me,
A1= time in
B1= time out
C1= time in
D1= time out
I want to calculate the late and under time,
Office start at 9:am w/30 mins Grace period,
The break time is one hour only, please include over breaktime in calculation.
End of office hours 6:00 pm, strickly no over time
I need help....I am working production scheduling with Start and End time but there is a lunch time and tea time. Is there any formula to calculate Start time to End time with excluding lunch time?
Here is example :
Lunch time :12:00pm to 1:00pm.
Duration Process :6 hours.
Start Time (8:00am)
End time (5:00 pm)
I need a formula to calculate from Start Time 8:00am and what is the End Time? with 1 hour lunch time...
Thanks,
ET
difference where the times cross midnight. Example:
Start time: 23:50:00
End time: 00:15:00
How would you formulate an equation to determine the duration of time or
differnce between the start and end time?
... If the time 04:16 falls in the time range 04:00 - 04:29, than put a one (1) in the filed x...
... If the time 04:16 doesn't fall in the time range 04:00 - 04:29, than leave the x fiel empty
Any help is appreciated.
B value Time of day punch in: 9:30 AM
C value =IF(D11="","","-")
D value Time of Day punch out: 6:00 PM
E value =IF(D11="","",IF(D11
sometimes, it takes 45 seconds to calc the whole sheet, other times, it takes 5 minutes. how do i clear the cache, or what do i have to do so that it calcs 45 seconds each time.
i don't want the application to think, it would be better if those 15,000 cells can be returned in a fraction-of-a-second. any ideas/tips? thanks.
Basically I have created a spreadsheet with several columns, but I have one column that lists the shirt size (YS, YM, YL, AS, AM, AL, XL, 2X, 3X) of each person. Is there a formula that I can create that will tabulate the number of sizes (i.e. AS=2, AM=7, etc.)?
In previous years I made a column for each size, and simply placed a "1" in the correct column, and had excel just add the 1's from each column. However, that takes more time and space. I was hoping to streamline it this time around.
Thanks for taking the time to read this post. Any help would be appreciated! Thanks, doug
We will be building 8 "widgets" a day.
We will work 10 hours a day.
There is a 20 minute break at 9:20 am.
Production shuts down for lunch 30 minutes for lunch at 12:30.
Production starts at 6:00 am.
Here is what I can do.
Production cycle time = (10*60)-30/8 or 71.25 minutes
If we start at 6:00 am, the first scheduled cycle completion time = TIME(6,0,0+71.25/1440)
My problem is when I am trying to use a logical "IF' statement to account for the 20 minute break or lunch and still calculate the end of each cycle time through the day I receive a number of error messages.
This is the formula I am trying to make work. I have the cell the formula is in, formatted with a "mm,ss" format.
=(IF(D4+G1/1440>9:20,(D4+G1)/24,(D4+G1+15)/1440))
I have included an attachment to help (a picture is worth a thousand words).
Any help will be greatly appreciated.
I have bought a number of books in an attempt to figure this out, and I am still stumped
I have a dillemma here,
I have to create a schedule which incorporates lunches automatically (either half hour or 1-hour lunches, depending on the circumstances).
The schedule only has time in and time out, but I need excel to automatically deduct the lunch break depending on the circumstance:
If you worked less than 6 hours = no lunch
If you worked more than 6 hours, but less than or equal to 8 hours = 0.5 hour lunch
If you worked more than 8 hours = 1 hour lunch
I am assuming the formula for this will be really long, but I have looked online everywhere and have not found ONE formula for it. I can't put lunch breaks seperately, so all I have to work with is Time in/out.
Also, I wouldn't be able to use military time, so I don't know how excel can assume that time in is in the morning, and time out is in teh evening and/or half-day.
If someone can help it would be greatlyyyy appreciated
I want to calculate the total time worked such that i have the hours worked. So if i worked 7 hours and 30min then the total time would be 7.5hrs. But i am not sure how to take into account the lunch break time (see enclosed sheet).
anyone have any ideas?
On the attached timesheet there are columns IN, OUT, IN,OUT
The lunch time is worked out by deducting 'C8 from C9' and this works fine when all 'IN, OUT' cells are filled in but for some reason when just the first two cells are filled in it gives a -12 hour answer.
looking at cell 'C11 ' in the attached worksheet, I currently have the formula
=IF(C13=0,","SUM(C9-C8)) The reason for this is to make it look tidy by having blank cells until a calculation is needed,, My problem is, If someone just comes in for the morning one day for instance 8am to 12 noon then they won't have lunch, but C11 will show -12:00
Can I put another formula into C11 to tell it not to deduct C8 from C9 until a time is put into C9.
The following is the sort of thing (many variations) I have been trying but because I'm hopeless at formulas I'm not having any success
Thanks
=IF(C13=0,","SUM(C9-C8))OR,IF(C9,ISBLANK,"",SUM(C9-C8)
I am trying to calculate our On Time Delivery. I want this as a simple percentage of jobs. I have got this running in the following way:
Column M - Estimated Delivery dates
Column N - Actual Delivery dates
Column O - =IF(SUM(M2-N2)>0,1,0)
Then I have calculated On Time Delivery as: =SUM((SUM(O2:O252))/(COUNTA(N2:N252)))
This seems to work fine. My problem is, if we enter a date in Estimated without a corresponding Actual date, the formula for Column O fills out anyway and improves our On Time Delivery Percentage. How can I set this up so that the formula doesn't calculate if there is no data in Column N?
Any help much appreciated
Thanks,
James
Received Date & Time: 10/29/2010 3:27:00 PM
Completed Date & Time: 11/1/2010 3:57:32 AM
Business Hours: 08:00 AM to 05:00 PM
Non Business hours: 05:00 PM to 08:00 AM
Weekdays : Monday to Friday
Weekends: Saturday & Sunday
If I calculate TAT for this time period it should show me 1 hour 33 minutes, why because business hours are closing by 5:00 PM on 10/29 so it should not calculate duration after 5:00 PM to until 08:00 AM on next day, however 10/29 is Friday so formula should calculate the duration from 10/29 Friday 3:37 PM to 10/29 5:00 PM and again it should calculate from 8:00 AM on 11/01 Monday and formula should skip Saturday & Sunday.
In this scenario I have completed the task before 8:00 AM on 11/01 so it should show duration of 1hour 33 minutes.
Please let me know if you need any more details
triangle. I copied it to create a new data set and used find &
replace to change the worksheet references to the new ones.
The cells still contain the result of the old formula referring to the
previous worksheets. The only way I can get the formula to return the
correct result is to edit (F2) each cell and press enter. Calc now
(F9) does nothing.
I've seen this before, but this time, I need to calculate many
thousands of cells and don't have time for this workaround.
Any ideas?
Thanks.
Don S