As the title goes this is as simple as it gets. The macro worked good when I was using excel 2003 but now that I have 2007 everything works for except the resizing (Picture.Width & Picture. Height).
Code:
Sub AddImage() Dim strPath As String Dim strFile As String Dim Picture As Object Dim Response As String Dim C As Range strPath = "C:\\Photos\" For Each C In Range("A1", Range("A65536").End(xlUp)) If C 0 Then With C.Offset(0, 1) Set Picture = Nothing On Error Resume Next Set Picture = Sheets("Raw Pix").Pictures.Insert(strPath & C.Value & ".jpg") Picture.Top = .Top Picture.Left = .Left Picture.LockAspectRatio = msoTrue Picture.Width = 157 Picture.Height = 138 End With End If NextC: Next C End Sub
I have tried to record some macros while I am resizing the pictures but to no avail the macros are blank.
Please help
Thanks!
I want to be able to reference it from a cell so that depending on a
validation list a different picture is shown.
Is this possible in Microsoft Exec 2000
So I am at work workin on this report and I need a function that will make Excel automatically insert the today's date in a cell (let's say D90) when I fill the content of another cell (for example C90) and the that will be inserted will never change. I tried to use the =TODAY( ) function but it keeps updating the date in the cell to the current date if i reopen the worksheet 2 days later. I need the cell to keep in the cell the date of the day when I filled in the content of cell C90 and do not updated it every time i open the document to the actual date.. Thanks in advance!!
I've been struggling with this for a while now and can't believe how hard it is!. I've searched on this site and on others to get some clarification but to no avail.
It's pretty simple really. I have a user form which contains a tex box for a user to input the date I want the format to be dd/mm/yyyy but can't find out how to set the format of the text box to this.
Please can someone give me a bit of guidence or link me to a good rescource if missed it in the search.
Thanks in advance.
G
form, where the user can enter the Last Name of the person they are searching
for.
I would like to have a new row automatically inserted with the formulas
updating to reference the cells in the new row. Let's say I start with 50
rows and after they are filled up, a new row is added automatically? How do I
do this?
Mike
Example: Existing data 1000UG01
Needs to be 1000UG.01
Existing cells are all the same length and the "." needs to be inserted in the same place.
Thanks in advance for any help.
I need to have a cell on Sheet2 display the TEXT from a cell on Sheet1, is his possible??
Example:
Sheet1, Cell A1 contains a clients name and I would like to have Sheet2, Sheet3, Sheet4 etc... Display that clients name in a cell of my choosing (could be a different cell on each Sheet) automatically after entering it once on Sheet1, cell A1.
I thought this was possible but I can't seem to figure it out. I haven't done any real Excel work in quite a long time but I thought I had done this before a long time ago!! Any help would be GREATLY appreciated!! Thanks in advance...
P.S. If I use autosum to do this it just displays the number 0, obviously, since it is trying to add numbers...
I uploaded a copy of the spreadsheet, What I would like to happen is have the text from Sheet1,D4 automatically be placed in Sheet2,A1 and Sheet3, B2. Hope this helps
-Aric
We will be building 8 "widgets" a day.
We will work 10 hours a day.
There is a 20 minute break at 9:20 am.
Production shuts down for lunch 30 minutes for lunch at 12:30.
Production starts at 6:00 am.
Here is what I can do.
Production cycle time = (10*60)-30/8 or 71.25 minutes
If we start at 6:00 am, the first scheduled cycle completion time = TIME(6,0,0+71.25/1440)
My problem is when I am trying to use a logical "IF' statement to account for the 20 minute break or lunch and still calculate the end of each cycle time through the day I receive a number of error messages.
This is the formula I am trying to make work. I have the cell the formula is in, formatted with a "mm,ss" format.
=(IF(D4+G1/1440>9:20,(D4+G1)/24,(D4+G1+15)/1440))
I have included an attachment to help (a picture is worth a thousand words).
Any help will be greatly appreciated.
I have bought a number of books in an attempt to figure this out, and I am still stumped
I have several accumulated values from other spreadsheets on my spreadsheet and I'm combining and organizing them on mine. However, the cell alignment isn't working properly as you can see in the picture below.
Now, I can certainly retype these values and align them and they'll align all nice and neat; however, I have a huge Column and retyping that column would take an inordinate amount of time.
I searched earlier on cell alignment and couldn't find anything. Any help is appreciated.
Sincerely,
Bill
Im unable to put any pics up as my work pc has java disable so photobucket ect won't work but has anyone else come across this problem and how did you rectify it? A search macro perhaps?
I have a spreadsheet with data from A1 to H1 down to A275 to H275. I select all of it, Copy, go into the Sheet2 tab and select A1, Paste Special -> Transpose and it give me the following error message:
Quote:
The information cannot be pasted because the Copy area and the paste area are not the same size and shape. Try one of the following:
- Click a single cell, and then paste.
- Select a rectangle that's the same size and shape, and then paste.
For the life of me, I can't figure out why it's not working! I have done this many times with other spreadsheets. Has anyone ever experienced this? If so, were you able to resolve it and how?
Many Thanks,
Mike
I'm quite experienced Excel user. I've never come across this problem but tinkering in every conceivable way within Excel settings and the solution has eluded me.
I have added a worksheet created elsewhere (it is a form I need printing, with the data coming from 2 sheets I have created from scratch) which has pre formatted cells for Date and Client Name etc.
When I try to reference the cell in this added sheet from my 2 sheets, instead of the result, it always displays the formula, not the result.
I have tried doing it from one of my sheets to reference to this new, and that displays the result and not formula. I can't imagine why it's doing this and I've never seen it happen before.
Formatting cells, giving cells names rather than the usually adequate of reference to the Cell Number doesn't change things. I wonder if I've picked up some legacy protection from the original form but can't see anywhere in the tools etc that's obvious.
There's about 50+ cells that need referencing and I got to get this done for work.
Please help me. This is my first need to post on a Excel Forum as I've always found help or answers from other peeps or internet but this one is making me scratch my head big time.
format the text cells (name, etc) to have text entered as uppercase
automatically although the user might use title or lower case.
UPPER function cannot make cell look at itself and perform the function
Excel 2003
I am brand new to Mr. Excel and would love some advice.
I searched the boards pretty extensively but could not find what I am looking for...I apologize if this is a duplicate.
I am using Excel 2007
How do you automatically add rows and update values for cells to a linked worksheet in which rows have been added? For example: Sheet 1, columns A & B are linked to Sheet 2, columns A & B. Sheet 2 has values in A1:A5 & B1:B5 and Sheet 1, since it is linked, has the same info. I want to add a row in between 3 & 4 on Sheet 2 and want Sheet 1 to automatically add the same row and update the value of the cell in column A & B.
Any help is greatly appreciated!
John
A specific problem is cells which don't have borders show up with very light grey borders in Outlook. This, I do not want.
TiA
I have a dillemma here,
I have to create a schedule which incorporates lunches automatically (either half hour or 1-hour lunches, depending on the circumstances).
The schedule only has time in and time out, but I need excel to automatically deduct the lunch break depending on the circumstance:
If you worked less than 6 hours = no lunch
If you worked more than 6 hours, but less than or equal to 8 hours = 0.5 hour lunch
If you worked more than 8 hours = 1 hour lunch
I am assuming the formula for this will be really long, but I have looked online everywhere and have not found ONE formula for it. I can't put lunch breaks seperately, so all I have to work with is Time in/out.
Also, I wouldn't be able to use military time, so I don't know how excel can assume that time in is in the morning, and time out is in teh evening and/or half-day.
If someone can help it would be greatlyyyy appreciated
I want it to automatically fill in today's date, when a certain empty cell has a value put in, then freeze there.
Thanks in advance!
Cell B5: start time: 4:15 formatted as 4:15:00 am
Cell B6: finish time: 6:15 formatted as 6:15:00 am
Cell B7: total time: 2:00 formula in cell: =TEXT(B6-B5,"h:mm")
Cell B8: total batches processed: 22 (this is entered manually)
Cell B9: batches per hour: formula in cell: =B8/TEXT(B7,"h")
as long as I have this formula in cell B9 the answer comes out correct which should be 11 per hour.
If the formula in B9 is B8/B7, the answer is 264.0, Is this because of the way excel is reading the total time or the total time is formatted as a time, not an actual number? Is this the correct way to solve the problem?
answer should be 11 per hour.