Formula To Convert Milliseconds Into Minutes |
Formula To Convert Milliseconds Into Minutes - Excel |
|
I'm getting frustrated trying to convert the a number eg. 1213391 which I know represents 20 minutes and 13.3 seconds in one easy formula. Can anyone help me out?
Thanks
Crash
Similar Topics
Please help!!!
We have a client who will pay using the 1/4, 1/2/ and 3/4 of an hour increments as follows:
From the hour mark to 6 minutes = 0 time paid
Over 7 minutes to 15 minutes = 1/4 hour 15
16 minutes to 30 minutes = 1/2 hour 30
30 minutes to 45 minutes = 3/4 hour 45
46 minutes to 60 minutes = one hour.
They work on shifts and the operation is 24 hours. Each gets 30 minutes for breaks which is not paid. Pay is biweekly and overtime is anything over 40 hours. Currently, the template we are using looks like this (sorry, I could not figure out how to paste it so you can see it in Excel layout):
WEEK 1 Sunday Monday Tuesday Wednesday Thursday Friday Saturday
5/16 5/17 5/18 5/19 5/20 5/21 5/22
TIME IN ENTER TIME, INCLUDE AM OR PM
TIME OUT
TIME IN
TIME OUT
TIME IN
TIME OUT
TIME IN Total Hours First Week
TIME OUT
HOURS WORKED-OR- choose one
*HOLIDAY WORKED
PAID HOLIDAY (not worked)
*OTHER PAID HOURS
EXPLANATION OF *HOLIDAY WORKED HRS OR *OTHER
I am very new to Excel and need help creating a formula that will allow us to calculate this timesheet? I am in desperate need for help.
Thanks..
For example, if I have a total of 53 calls and the total talk time is 4:19:05, what would the average talk per call be? I tried doing everything in seconds (this would give me a total of 15545 seconds) but the total I was getting is 4:89.
What would the formula be to get the correct average time?
We will be building 8 "widgets" a day.
We will work 10 hours a day.
There is a 20 minute break at 9:20 am.
Production shuts down for lunch 30 minutes for lunch at 12:30.
Production starts at 6:00 am.
Here is what I can do.
Production cycle time = (10*60)-30/8 or 71.25 minutes
If we start at 6:00 am, the first scheduled cycle completion time = TIME(6,0,0+71.25/1440)
My problem is when I am trying to use a logical "IF' statement to account for the 20 minute break or lunch and still calculate the end of each cycle time through the day I receive a number of error messages.
This is the formula I am trying to make work. I have the cell the formula is in, formatted with a "mm,ss" format.
=(IF(D4+G1/1440>9:20,(D4+G1)/24,(D4+G1+15)/1440))
I have included an attachment to help (a picture is worth a thousand words).
Any help will be greatly appreciated.
I have bought a number of books in an attempt to figure this out, and I am still stumped
How do I enter this into a cell
i have a column of numbers that we extracted from a database as whole numbers. for instance, 30 should be .30 and 100 should be 1.00. when i try to increase or decrease the decimal point it doesn't allow me to convert it to those positions.
would any one have a tip of how i can easily convert this? there are over 2000 entries in my excel spreadsheet so to do it manually would take a lot of time/effort.
thank you!
sometimes, it takes 45 seconds to calc the whole sheet, other times, it takes 5 minutes. how do i clear the cache, or what do i have to do so that it calcs 45 seconds each time.
i don't want the application to think, it would be better if those 15,000 cells can be returned in a fraction-of-a-second. any ideas/tips? thanks.
B value Time of day punch in: 9:30 AM
C value =IF(D11="","","-")
D value Time of Day punch out: 6:00 PM
E value =IF(D11="","",IF(D11
Received Date & Time: 10/29/2010 3:27:00 PM
Completed Date & Time: 11/1/2010 3:57:32 AM
Business Hours: 08:00 AM to 05:00 PM
Non Business hours: 05:00 PM to 08:00 AM
Weekdays : Monday to Friday
Weekends: Saturday & Sunday
If I calculate TAT for this time period it should show me 1 hour 33 minutes, why because business hours are closing by 5:00 PM on 10/29 so it should not calculate duration after 5:00 PM to until 08:00 AM on next day, however 10/29 is Friday so formula should calculate the duration from 10/29 Friday 3:37 PM to 10/29 5:00 PM and again it should calculate from 8:00 AM on 11/01 Monday and formula should skip Saturday & Sunday.
In this scenario I have completed the task before 8:00 AM on 11/01 so it should show duration of 1hour 33 minutes.
Please let me know if you need any more details
For example: Cell A1 has a time format (hh:mm) value of 04:00; which is the Start Time. I would like cell D1 to have a text format value of "04:00" (result is dependant upon what is entered in A1). I would duplicate the same formulas to reflect Stop Times in other cells.
My final result is to have another cell (F1) use the Concatenate formula to have the Start and Stop time shown in one cell as "04:00 - 12:30". The times would change based on the Time formated values entered into the Start and Stop time cells.
I have researched this in the board and found many excellent ways to do the opposite, but not convert Time format to Text format. Any assistance is greatly appreciated.
-Shane
I would like to have a help in programming the code for Auto refresh every 5 seconds or so in the excel sheet attached.
The file is Downloaded from one of the sites.
Need to modify with adding a code of auto refreshing every 5 seconds instead of default 1 minutes.
Thanks
Pritz
Is there a way to enter a colon into a standard number to create a value that can be formatted into a 24 hour time value ?
eg a time is listed as 1345 with a general number format, and I want it returned as 13:45 witha custom format of hh:mm.
Other than creating a table and using a vlookup function, I am hoping there is a better way?
Darren
I made a simple worksheet that we have been manually entering the time for employees, but there are too many errors (even with simple math). Can someone help me convert the time of ex: written 8-4:30 or 10-3 (meaning 8:00am to 4:30pm) where you have the total weekly hours? Right now I have a column for overtime. Is there a way to automatically calculate the over time also? The work day is 8-4:30 with a half hour lunch (lunch is not calculated into the hours, so you minus a half hour). 8-4:30 equals 8 hours. So, if a person works 8am to 6:30pm, how can I set it up where in the first row of time, I will type in 8-6:30pm. In the totals column to the far right, it will display 8 hours. In the (O.T.) column, it will display 2 hours.
This way, when I call in my payroll, I will have the total "regular" hours in one row and underneath, I will have the total overtime hours.
Or... does anyone have a better solution to keeping track of their hours?
Thanks!
Marty
Eg.
Converting 1h 15min (1:15) to 1.25
Cell B5: start time: 4:15 formatted as 4:15:00 am
Cell B6: finish time: 6:15 formatted as 6:15:00 am
Cell B7: total time: 2:00 formula in cell: =TEXT(B6-B5,"h:mm")
Cell B8: total batches processed: 22 (this is entered manually)
Cell B9: batches per hour: formula in cell: =B8/TEXT(B7,"h")
as long as I have this formula in cell B9 the answer comes out correct which should be 11 per hour.
If the formula in B9 is B8/B7, the answer is 264.0, Is this because of the way excel is reading the total time or the total time is formatted as a time, not an actual number? Is this the correct way to solve the problem?
answer should be 11 per hour.
format/cells/number from the category list. But it won't take, and stays
text-like. Any ideas?
inbetween the two dates. Does anyone know how to then convert the number of
days into months?
24 hour format i.e. 15:00. How can I do this?
would really appreciate anyones help with this.
I have a column full of text-formatted fractions...
4/5
6/4
3/1
2/5
4/5
etc, etc.....the column is very long!!
I need to convert these to actual fractions...ones I can add to equations, allowing me to multiply and add.
If I highlight the column and goto "format Cells" and change to fraction, the values still stay in the left of the cell.....its only when I manually click on each individual cell, then tick the little green tick, does the cell validate, and the value in the cell moves to the right (and is therefore a proper value).....problem is I have to keep doing this for each individual cell.....and I have 70000+ cells in this column!
Any suggestions on how I could speed this up?
thanks
I have a dillemma here,
I have to create a schedule which incorporates lunches automatically (either half hour or 1-hour lunches, depending on the circumstances).
The schedule only has time in and time out, but I need excel to automatically deduct the lunch break depending on the circumstance:
If you worked less than 6 hours = no lunch
If you worked more than 6 hours, but less than or equal to 8 hours = 0.5 hour lunch
If you worked more than 8 hours = 1 hour lunch
I am assuming the formula for this will be really long, but I have looked online everywhere and have not found ONE formula for it. I can't put lunch breaks seperately, so all I have to work with is Time in/out.
Also, I wouldn't be able to use military time, so I don't know how excel can assume that time in is in the morning, and time out is in teh evening and/or half-day.
If someone can help it would be greatlyyyy appreciated