Formula To Calculate Increase/decrease |
Formula To Calculate Increase/decrease - Excel |
|
I can calculate the formula for this , but the problem comes where for eg there is a loss in Jan 2008 for -95415 and there was a profit in Jan 2007 for 80215. How do I set up formula to take negatives & positives into account in calculating the increase or decrease/
Your assistance or anybody's on the forum will be greatly appreciated
Regards
Howard
http://www.mrexcel.com/forum/showthr...ghlight=howardneed
Similar Topics
i have a column of numbers that we extracted from a database as whole numbers. for instance, 30 should be .30 and 100 should be 1.00. when i try to increase or decrease the decimal point it doesn't allow me to convert it to those positions.
would any one have a tip of how i can easily convert this? there are over 2000 entries in my excel spreadsheet so to do it manually would take a lot of time/effort.
thank you!
I have two columns of data: column A contains the date and time in the form dd/mm/yyyy. Column B contains a number value. All the times are in order, so column A looks like:
01/01/2007
02/01/2007
03/01/2007
I have data from 2007 to 2010. I need to calculate an average daily value (in column B) for each month, and display it in column C. So, for January, I need to calculate the average of 31 days, February, 28 days, etc.
Is there a function I can use to do this? I've been trying the AVERAGEIF formula but can't get it to work. Any ideas would be much appreciated!
Many thanks,
Caitlin
I am trying to calculate our On Time Delivery. I want this as a simple percentage of jobs. I have got this running in the following way:
Column M - Estimated Delivery dates
Column N - Actual Delivery dates
Column O - =IF(SUM(M2-N2)>0,1,0)
Then I have calculated On Time Delivery as: =SUM((SUM(O2:O252))/(COUNTA(N2:N252)))
This seems to work fine. My problem is, if we enter a date in Estimated without a corresponding Actual date, the formula for Column O fills out anyway and improves our On Time Delivery Percentage. How can I set this up so that the formula doesn't calculate if there is no data in Column N?
Any help much appreciated
Thanks,
James
The Geomean function doesn't work because it only uses positive numbers.
Any help would be greatly appreciated.
Are there any ways around this so that it updates upon dragging the formula?
I am creating a basic accounting spreadsheet and I ask for assistance to automate data entry posts. I would like to have entries that are entered in the general journal automatically post to the corresponding ledger accounts. The entries need to remain in chronological order. Relative cell referencing will not work because the rows in the ledgers will not correlate to the rows in the journal because the journal but the entries in the ledger need to input on the next available row in that ledger account. Additionally, as the number of entries increase, can the ledger accounts add a new row?
Attached is a very simple example with three transactions. I have included an end state view in the ledger accounts tab.
Received Date & Time: 10/29/2010 3:27:00 PM
Completed Date & Time: 11/1/2010 3:57:32 AM
Business Hours: 08:00 AM to 05:00 PM
Non Business hours: 05:00 PM to 08:00 AM
Weekdays : Monday to Friday
Weekends: Saturday & Sunday
If I calculate TAT for this time period it should show me 1 hour 33 minutes, why because business hours are closing by 5:00 PM on 10/29 so it should not calculate duration after 5:00 PM to until 08:00 AM on next day, however 10/29 is Friday so formula should calculate the duration from 10/29 Friday 3:37 PM to 10/29 5:00 PM and again it should calculate from 8:00 AM on 11/01 Monday and formula should skip Saturday & Sunday.
In this scenario I have completed the task before 8:00 AM on 11/01 so it should show duration of 1hour 33 minutes.
Please let me know if you need any more details
=DATEDIF(E21,TODAY(),"y")&" y "&DATEDIF(E21,TODAY(),"ym")&" m"
Thanks
Rick
I'm hoping someone can help me.
I need to be able to clear the contents of cells in column C, D, E, H if the value of column Q equals HELLO for arguments sake.
Clearing the contents of an entire row is not a problem, however when it comes to resizing rows I seem to come unstuck.
Related thread: http://www.mrexcel.com/forum/showthread.php?t=476993
Any help would be appreciated.
the top half of my spreadsheet are assumptions, formatted with the corrects widths needed, but then below I have calculations and such that I do not want the same widths for. how can I lock in the top part so I can decrease the column widths for the bottom half of my spreadsheet?
hope this makes sense.
Im working with a large data spreadsheet that has Yes and No answers in different columns. There are blanks within the selection too.
I need to calculate only the Yes.
I have tried using the filters in the Pivot Table field list and they are not working.
So now i'm trying to add a COUNTIF formula in the Calculated Fields section.
The formula I'm using is =Countif('Time limit extension'="yes") and i get the answer "too few."
What should I be using in the formula to get the calculated field to work? I have search the whole forum and I haven't found an answer that can help me.
Please HELP!!!
There is about 20 staffs in our department and I have made a spreadsheet with 12 tabs for each month of the year Jan-Dec. If each staff have 15 days annual leave each year and how can I make a formular that can automatically calculate the balance of annual leave and entered in the tabs of the following months. For example if staff A used 5 days in Jan how can the balance of 10days be entered in the tabs from Feb-Dec. If he use another 5 days in July the remain balance of 5 days be automatically entered in the tab from Aug to Dec. Likewise if staff A took 2 days sick leave in Jan, and 2 days in Mar how can this sick days be automatically sum up in the months after. I am doing this manually at the moment and it is very time consuming and also very easy to make mistake.
Thanks and sorry for this long questions
I'm working with Excel 2003 sp 3 on Windows xp.
I have been banging my head trying to jar loose the formula to calculate man days where 1 equals 8 hours. I have one that was given to me by a coworker:
=INT(Q3/8)+(((Q3/8)-(INT(Q3/8)))*0.8)
That calculates man days from total hours. I need a formula that will total man days and return the man day answer. Example:
weekending 12/25 = 16.2 which is 16 man days and 2 hours
weekending 1/1 = 24.7 which is 24 man days and 7 hours
Total = 41 man days and 1 hour
I have also been asked if there was a way for a number to be entered into a spreadsheet and automatically put in order without a macro or "pushing a button".
Any advice is greatly appreciated!
Happy New Year!
~ Brenda ~
for example: if an employee works 10 hours a day we would not count towards overtime until the employee completes a 40 hour work week.
Any suggestions would be greatly appreciated!!!!!
Thanks,
YV
On excel, if I divide 462,534.05 by 335 I get 1,380.70. Then if I times 1,380.70 by 335 I get the SAME result of 462,534.05.
I have to account for the difference of not dividing equally so there is some format or accounting function that's preset that I don't want but I have no idea how to fix it or format my excel sheet to calculate as my calculator would.
Please can someone help? Thanks!
triangle. I copied it to create a new data set and used find &
replace to change the worksheet references to the new ones.
The cells still contain the result of the old formula referring to the
previous worksheets. The only way I can get the formula to return the
correct result is to edit (F2) each cell and press enter. Calc now
(F9) does nothing.
I've seen this before, but this time, I need to calculate many
thousands of cells and don't have time for this workaround.
Any ideas?
Thanks.
Don S
(changes the cells it should subtract), however, the result stays the same.
It matches the formula I copied it from, even though the cells to calculate
are now different. I even did a paste special and said only formula, but
still, same result. If I actually type in the formula, it works fine, but I
have a lot I need to copy and paste. Is there a way I can fix this?
Thanks,
We will be building 8 "widgets" a day.
We will work 10 hours a day.
There is a 20 minute break at 9:20 am.
Production shuts down for lunch 30 minutes for lunch at 12:30.
Production starts at 6:00 am.
Here is what I can do.
Production cycle time = (10*60)-30/8 or 71.25 minutes
If we start at 6:00 am, the first scheduled cycle completion time = TIME(6,0,0+71.25/1440)
My problem is when I am trying to use a logical "IF' statement to account for the 20 minute break or lunch and still calculate the end of each cycle time through the day I receive a number of error messages.
This is the formula I am trying to make work. I have the cell the formula is in, formatted with a "mm,ss" format.
=(IF(D4+G1/1440>9:20,(D4+G1)/24,(D4+G1+15)/1440))
I have included an attachment to help (a picture is worth a thousand words).
Any help will be greatly appreciated.
I have bought a number of books in an attempt to figure this out, and I am still stumped