Calculating Sale/cost/margin Smartly |
Calculating Sale/cost/margin Smartly - Excel |
|
Cost = B1
Margin = C1
I know to calculate Margin its' C1=1-(B1/A1) and to calculate Sale its, A1=B1/(1-C1), and I can do that in separate columns. But...... I'm tasked with trying to find a way so that I can do it in three columns. As in if I change cost then margin recalculates or if I change margin then sale recalculates. I'm thinking that this is going to cause a circular error but my boss says there's got to be a way to do it, figure it out. Any suggestions?
Alex
Similar Topics
so I thought I would try again.
Does anyone know of an Excel template--or a small stand-alone
program--that will calculate the interest/principal breakdown when
payments are varied in amount and frequency? Free or low-cost, please.
I need one that will work on my Mac/Office 2004. I will need to print
out periodic reports.
Here is the way the previous poster described it:
"Excel template: Loan Amortization for random/irregular payments,
figures days
between payment dates.
I have a loan with a variable beginning balance and irregular payments
with
annual large payment. (based on collections)
Would like to enter payment and date.
then Excel would figure days since last payment, interest amount,
principal
amount, Ending Principal balance.
And total interest paid, total pricipal paid
If I change the starting principal, excel would recalculate all
entries."
Thanks very much.
I would like to send SMS from a VBA macro to my mobile phone. Do anyone know how to do this?
I am ready to pay a cost per SMS if necessary.
(I asked the same question at another Excel forum without getting any reply.)
On excel, if I divide 462,534.05 by 335 I get 1,380.70. Then if I times 1,380.70 by 335 I get the SAME result of 462,534.05.
I have to account for the difference of not dividing equally so there is some format or accounting function that's preset that I don't want but I have no idea how to fix it or format my excel sheet to calculate as my calculator would.
Please can someone help? Thanks!
I have two columns of data: column A contains the date and time in the form dd/mm/yyyy. Column B contains a number value. All the times are in order, so column A looks like:
01/01/2007
02/01/2007
03/01/2007
I have data from 2007 to 2010. I need to calculate an average daily value (in column B) for each month, and display it in column C. So, for January, I need to calculate the average of 31 days, February, 28 days, etc.
Is there a function I can use to do this? I've been trying the AVERAGEIF formula but can't get it to work. Any ideas would be much appreciated!
Many thanks,
Caitlin
triangle. I copied it to create a new data set and used find &
replace to change the worksheet references to the new ones.
The cells still contain the result of the old formula referring to the
previous worksheets. The only way I can get the formula to return the
correct result is to edit (F2) each cell and press enter. Calc now
(F9) does nothing.
I've seen this before, but this time, I need to calculate many
thousands of cells and don't have time for this workaround.
Any ideas?
Thanks.
Don S
I can calculate the formula for this , but the problem comes where for eg there is a loss in Jan 2008 for -95415 and there was a profit in Jan 2007 for 80215. How do I set up formula to take negatives & positives into account in calculating the increase or decrease/
Your assistance or anybody's on the forum will be greatly appreciated
Regards
Howard
http://www.mrexcel.com/forum/showthr...ghlight=howardneed
Received Date & Time: 10/29/2010 3:27:00 PM
Completed Date & Time: 11/1/2010 3:57:32 AM
Business Hours: 08:00 AM to 05:00 PM
Non Business hours: 05:00 PM to 08:00 AM
Weekdays : Monday to Friday
Weekends: Saturday & Sunday
If I calculate TAT for this time period it should show me 1 hour 33 minutes, why because business hours are closing by 5:00 PM on 10/29 so it should not calculate duration after 5:00 PM to until 08:00 AM on next day, however 10/29 is Friday so formula should calculate the duration from 10/29 Friday 3:37 PM to 10/29 5:00 PM and again it should calculate from 8:00 AM on 11/01 Monday and formula should skip Saturday & Sunday.
In this scenario I have completed the task before 8:00 AM on 11/01 so it should show duration of 1hour 33 minutes.
Please let me know if you need any more details
for example: if an employee works 10 hours a day we would not count towards overtime until the employee completes a 40 hour work week.
Any suggestions would be greatly appreciated!!!!!
Thanks,
YV
I have a file that has 8 sheets. the first seven sheets are the days of the week and the 8th sheet is where I want to calculate the hours.
The days of the week consists of "Name" "Date" Hours"
The 8th sheet consists of "Name", "Days of the week in their own column (7 columns in total)", "Total Hours" and "Total Days Worked"
Now... each day is always a different group and what I'm hoping for is to create a formula that can grab each name with their hours and throw them into the 8th sheet. So when the end of the week is done I have all the Employees weekly hours and days worked all finished.
I hope this makes sense. This file is to track about 100 employees that are on a rotational work schedule.
I have attached a sample file.
Thanks in advance for your help.
difference where the times cross midnight. Example:
Start time: 23:50:00
End time: 00:15:00
How would you formulate an equation to determine the duration of time or
differnce between the start and end time?
worksheet are using it, they can't change the width. It's for editors who
write headlines for specific areas that can only be as long as the column is
wide or the text won't fit.
I have created a complex formula to help me calculating Golf handicaps for players.
The formula is in the first cell and I want to drag the formula across to the right to cover the 18 holes.
But ALL the values change and I want some to change and some to stay constant.
How do I tell excel to drag the formula across but keep certain parts of the formula the same..ie ....=D11.... in the formula when dragged across doesn't go D12,D13;D14 in each cells formula and should stay as D11 for all.
Many thanks for your help
Ole
The Geomean function doesn't work because it only uses positive numbers.
Any help would be greatly appreciated.
I am trying to calculate our On Time Delivery. I want this as a simple percentage of jobs. I have got this running in the following way:
Column M - Estimated Delivery dates
Column N - Actual Delivery dates
Column O - =IF(SUM(M2-N2)>0,1,0)
Then I have calculated On Time Delivery as: =SUM((SUM(O2:O252))/(COUNTA(N2:N252)))
This seems to work fine. My problem is, if we enter a date in Estimated without a corresponding Actual date, the formula for Column O fills out anyway and improves our On Time Delivery Percentage. How can I set this up so that the formula doesn't calculate if there is no data in Column N?
Any help much appreciated
Thanks,
James
can calculate overtime hours. In california over 8 hrs in one day is
overtime. The 8 would be considered regular hours and anything over is OT.
We will be building 8 "widgets" a day.
We will work 10 hours a day.
There is a 20 minute break at 9:20 am.
Production shuts down for lunch 30 minutes for lunch at 12:30.
Production starts at 6:00 am.
Here is what I can do.
Production cycle time = (10*60)-30/8 or 71.25 minutes
If we start at 6:00 am, the first scheduled cycle completion time = TIME(6,0,0+71.25/1440)
My problem is when I am trying to use a logical "IF' statement to account for the 20 minute break or lunch and still calculate the end of each cycle time through the day I receive a number of error messages.
This is the formula I am trying to make work. I have the cell the formula is in, formatted with a "mm,ss" format.
=(IF(D4+G1/1440>9:20,(D4+G1)/24,(D4+G1+15)/1440))
I have included an attachment to help (a picture is worth a thousand words).
Any help will be greatly appreciated.
I have bought a number of books in an attempt to figure this out, and I am still stumped
Can you please help me,
A1= time in
B1= time out
C1= time in
D1= time out
I want to calculate the late and under time,
Office start at 9:am w/30 mins Grace period,
The break time is one hour only, please include over breaktime in calculation.
End of office hours 6:00 pm, strickly no over time
it as a drop-down list, you can select a name from the drop-down and it's
corresponding value will be added to separate cell? Basically, I have survey
questions which have five possible responses: Excellent - Very Good - Good -
Fair - Poor. We want to assign a value to each, 5 for Excellent, 4 for Very
Good and so on, so that when a response is selected from a drop-down, it's
value appears in a separate cell (so that we can calculate a total and
average score from the selections).
Thanks
B
example;
8:00 to 8:07 = 8.0 hrs
8:08 to 8:23 = 8.25 hrs
8:24 to 8:38 = 8.5 hrs
8:39 to 8:53 = 8.75 hrs
8:53 to 8:59 = 9.0 hrs
I am having trouble writing an equation that would sum the clock-in and clock-out times (2 per day) and display the total time in these quarter hours and adding an additional hour if it is >= to *:53. Any help would be great.